Close

Inspection Of Siar Block by DM

It was instructed in the inspection of the block-Siar that all the records should be kept up-to-date and maintained properly. Ensure all BDOs. All under-construction panchayat buildings and community toilets should be completed before 25 March. Every household toilet should also be verified